Shenzhen, China · Factory direct since 2007 5,000 m² plant · Every process in-house · Ships worldwide
+86 755 2796 7043 Mon–Fri 09:00–18:00 GMT+8
EN Get a Quote

Project

The drawing checklist: what turns a quote into a part that fits

Most wrong parts were not made wrong. They were ordered with a drawing that left the important things to be guessed.

~1,700 words · 9 min read · Updated 2026-11-10

Every job that goes wrong has a moment where somebody assumed something. Usually it is the fabricator assuming a default, and the default being different from what the customer pictured. A drawing checklist is cheaper than that conversation.

The twelve items

What belongs on an acrylic part drawing
ItemWhy it mattersCommon default if omitted
Outline dimensionsDefines the partNo default: the part cannot be made
Material and gradeCast, extruded, ESD, FR, UV, opticalWhatever is on the shelf
Thickness and toleranceDrives stiffness, cost and fitNominal, ±10 percent
Hole positions and diametersDefines the fitScaled from the drawing, sometimes wrongly
Which holes are locating featuresDecides process and toleranceTreated as clearance holes
Edge finish, by edgeThe most visible and most costly variableAs cut
Face finish and which faces are seenDecides polishing and protectionAll faces equal
Print, etch or engrave artworkDefines the graphic and the methodNone
Fixing detailDecides whether the part cracks in serviceTight holes, no washers
Tolerance for anything that matesPrevents a part that almost fitsGeneral tolerance only
Quantity and inspection levelDecides price and scheduleOne off, no inspection report

The three most commonly omitted

Which faces are seen

A drawing with no visible-face callout gets a part machined and finished symmetrically, which is the most expensive way to make it. Mark the visible faces. Every hole in a visible face costs extra because it has to be re-polished; every hidden edge can be left as cut.

The cleaning chemical

Nobody puts the cleaning product on a drawing, and it is the single fact that most often decides whether a part survives its first year. Ammonia based glass cleaner will craze acrylic; so will acetone, MEK and most workshop degreasers. If the part will be cleaned daily, name the product.

The operating temperature

Temperature decides the fixing detail as much as the material. A panel that swings 30 degrees needs slotted holes; one that sits in a stable office does not. It takes one line to state and it prevents the most common service failure.

How to write a tolerance that means something

  • GENERAL TOLERANCE: ±0.5 mm UNLESS STATED covers most acrylic parts and costs nothing extra.
  • HOLE POSITION: ±0.2 mm only for holes that take a pin, a dowel or a bearing.
  • ±0.1 mm on a part under 300 mm is achievable; on a 1,500 mm panel it is not, because the sheet expands more than that over a few degrees.
  • THICKNESS: cast sheet, ±10 percent is normal. ±5 percent selected costs more and is worth it only for a stack that must close.

A tolerance is a cost instruction as much as a quality instruction. A general tolerance is free because the process naturally holds it. A tight one means slower feeds, more measurement and a higher reject rate, which is why the price moves when the number gets smaller.

The fixing block

This is the part of the drawing that most affects whether a part lasts, and it is usually the least detailed. A standard block that can be copied onto any acrylic drawing:

  • FIXING: Ø[fastener + 1.5 to 2 mm] THRU, NYLON WASHER BOTH FACES
  • SLOT ±3 mm ON THE LONG AXIS FOR ANY PANEL OVER 800 mm
  • NO THREAD IN ACRYLIC (or specify an insert and its depth)
  • MIN EDGE DISTANCE 1.5 × HOLE Ø, 2 × WHERE LOADED
  • DO NOT CLAMP: PANEL TO FLOAT ON GASKET

What a good file package looks like

  1. A PDF drawing with notes, dimensions and the title block.
  2. A DXF of the flat outline with hole centres, in millimetres, at 1:1.
  3. A STEP file if the part is bent, bonded or three-dimensional.
  4. The artwork as vector, with Pantone references, if there is a print.
  5. A reference photo of a similar part or of the installation if one exists.

With that package, a quote is accurate and a first article usually fits. Without it, the quote is a guess and the first article is the test.

What we do with a drawing before cutting

We check the drawing against itself first: outline against hole pattern, thickness against the fixing depth, edge distances, radius against cutter. Anything that contradicts is raised with a marked-up drawing before material is cut. That check is free and it is the cheapest part of the whole process.

Questions this article answers

For a simple flat part, yes, if the dimensions are complete and the material and finish are stated. For anything machined or bonded, a drawn file is faster and avoids a wrong interpretation.

DXF and DWG for flat parts, STEP and IGES for three-dimensional parts, PDF for drawings with notes, and AI, EPS or PDF for print artwork with fonts outlined.

A DXF with hole centres is enough and is less error-prone than a dimensioned drawing. If you send a drawing only, dimension from two datums rather than chaining dimensions, which accumulates error.

It is the tolerance that applies to any dimension without its own callout. We apply ±0.5 mm unless the drawing states otherwise, and we write it on the drawing so both sides have agreed it.

Because it changes the process and the price. A visible face needs protection, careful handling and re-polishing after machining; a hidden face does not. Knowing which is which is how a part gets finished properly at the lowest cost.

A one-page drawing template that answers everything

Most back-and-forth on a quotation comes from the same eight or nine fields being missing, and the fastest way to stop it is to put those fields on the drawing itself, in a block, filled in. The template below is the one we reconstruct by hand on half the drawings that arrive. Print it, fill it, and the first reply becomes a price instead of a list of questions.

Drawing fields that remove the questions
FieldWhat to writeWhat it prevents
Material and gradeCast PMMA, 8 mm, clear, one or two sides masked Extruded sheet substituted on a machined part
General tolerance±0.3 mm unless noted Quoting to ±0.1 mm across the whole part
Critical featuresDatum A = face; holes at ±0.1 mm from A Tightening every dimension to protect two
Edge finishDiamond polish on visible edges only, as-routed elsewhere Polishing a metre of hidden edge
BondingSolvent bond, joints on the returns, cleats hidden A visible seam under store lighting
AnnealingAnneal after machining, 80 °C / 4 h, ramp ≤10 °C/h Crazing three weeks after delivery
Flatness<1 mm per metre, measured free-standing on three points Two different measurement methods in one argument
Quantity and breaks50 / 200 / 500 with a per-store split A quote that cannot be compared to another quote
Packing and marksExport carton, logo on film, buyer part number label Re-packing at your warehouse

The two fields that get skipped most often are edge finish and packing, and they are the two that move the price furthest. On a typical display part, changing "polish everything" to "polish visible edges" removes 30–40% of the finishing cost without changing what the customer sees. Changing from bulk to retail-ready packing can add 8–15% of the goods value. Neither is visible on a drawing that does not mention them, so both get guessed — and the guess is not always the one you wanted.

One habit worth adopting: put the revision number and the date in the file name as well as the title block. We receive files called "bracket-final.dxf" at revision 3, 4 and 5, and the one thing nobody can answer later is which one was approved. A filename of "MJ-2401-bracket-R03-2026-03-14.dxf" costs nothing and settles the question permanently.

Send the drawing and we will check it before quoting

We mark up anything that contradicts itself or will not survive service, before material is cut.

WhatsApp