Writing an acrylic specification that survives a tender

A specification that names a product gets substituted. One that states a performance and a test method gets what was intended.

~1,500 words · 8 min read · Updated 2026-11-10

A tender specification has one job: to describe the outcome precisely enough that any compliant supplier produces the same thing, and loosely enough that more than one supplier can bid. Most acrylic specifications fail at one end or the other.

Performance or product

Two ways to specify, and when each works
ApproachExampleStrengthWeakness
Product namedPanel to be [brand] clear cast acrylic 8 mmUnambiguousRestricts competition; brand may be discontinued
Performance statedClear cast PMMA, light transmission ≥90%, thickness 8 mm ±10%, flatness ≤2 mm/mAllows equivalents, survives product changesRequires the specifier to know what matters
HybridPerformance criteria plus an approved-equal clauseCompetition with a benchmarkNeeds a fair evaluation process

For most projects the hybrid is right: state the performance that matters, name a benchmark product as an example, and include an approved-equal clause with a clear evaluation basis.

The clauses that actually matter

  • Material type and grade: cast PMMA, not extruded, and the grade family (standard, UV-stabilised, FR, ESD, optical).
  • Thickness and tolerance: nominal plus tolerance. Without a tolerance, a supplier may bid a lighter gauge and still comply.
  • Light transmission: a number and a test method, if clarity matters.
  • Flatness: a value and the measurement method and support condition.
  • Edge and face finish: by edge, by face, with an approved sample referenced.
  • Fixing: the method and the allowance for movement, because this is what fails in service.
  • Fire performance: the rating, the thickness at which it applies, and the report required.
  • Cleaning: the products that are and are not permitted, as a handover requirement.
  • Warranty: a period and what it covers, stated in terms of appearance and structural integrity separately.

The substitution problem

Substitution is the most common failure in plastic glazing procurement: a bidder supplies a thinner sheet, an extruded sheet where cast was specified, or a non-UV grade, and everything looks fine until the panels bow or yellow two years later.

The defences are documentary rather than physical:

  1. Require the mill certificate with each delivery, stating grade, thickness and batch.
  2. Require a sample for approval before the first delivery, retained by both parties.
  3. State that any substitution requires written approval with evidence, and that unapproved substitution is a rejection.
  4. Require the thickness to be measured on delivery at specified points.

Warranty wording

An acrylic warranty should separate two things that fail differently.

Appearance
Yellowing, clarity loss and colour fade, over a stated period, under stated exposure conditions. Typical for UV-stabilised cast acrylic is 10 years, and it is a real commitment only if the grade supports it.
Structural integrity
Cracking and delamination not caused by impact or by installation error. This is where the fixing detail matters, and a warranty that does not exclude incorrect fixing is a warranty against the installer.
Exclusions
Impact, chemical attack from an unapproved cleaner, modification on site, and installation not to the specification.

What to ask a bidder to submit

  • The sheet grade and manufacturer, with a data sheet.
  • The mill certificate for the batch to be supplied.
  • A method statement for fixing, including the movement allowance.
  • A sample of the finish, at full thickness.
  • A cleaning and maintenance instruction, ready for handover.
  • The fire test report, if a rating is required, at the specified thickness.

Where fabricators can help before the tender

A fabricator who will bid can review a draft specification and flag clauses that are unbuildable, ambiguous or unnecessarily expensive. That review costs nothing and usually saves a revision after tender, which is the most expensive place to make a change.

Questions this article answers

Only as a benchmark with an approved-equal clause. A named brand alone restricts competition and may be discontinued mid-project, which leaves the specification unbuildable.

State the thickness with a tolerance, require the mill certificate with each delivery, and measure on delivery. A specification without a tolerance and without a certificate requirement cannot be enforced.

UV-stabilised cast acrylic can support a 10-year appearance warranty under stated exposure. Structural warranty should be shorter and must exclude impact and incorrect fixing.

If the panel is a lining or a large internal surface, the local reaction-to-fire class may apply. State the class and the thickness, and require the report at that thickness.

Yes, at no cost. We flag clauses that cannot be built, that are ambiguous, or that add cost without adding performance.

How a specification survives the bid process

A well-written clause can still be lost between tender and delivery, and it usually happens in one of three places: it is translated into a purchase order that drops a requirement, it is met by a substitution that is technically compliant, or it is tested by a method nobody agreed on.

StageWhere the clause is lostWhat prevents it
Tender to POThe PO references the schedule but not the specification annexName the annex in the PO and attach it, not just reference it
PO to drawingA performance requirement is translated into a product nameKeep performance clauses in the drawing notes; never let a brand name stand in for a property
Drawing to partA tolerance is applied "typically" rather than to a named featureA tolerance table with feature references
Part to acceptanceTest method unspecified, so both sides measure differentlyName the instrument, the temperature and the sample size
Acceptance to fileRecords not retained past the projectState a retention period in the contract

The single most effective sentence in an acrylic specification is a test method rather than a property. "Flat to 0.2 mm" invites an argument; "flat to 0.2 mm, measured on a granite surface at 20 °C with a dial indicator at five points" does not. The second version costs nothing to write and removes the entire dispute.

Where a framework agreement runs for years, add a clause about change notification: if the sheet grade, the supplier of the sheet or the process sequence changes, the fabricator notifies before supplying. That clause is what stops a compliant part in year one becoming a non-compliant part in year three without anybody deciding to change anything.

Send the draft clause before the tender

A review now is cheaper than a revision after award. We will tell you which clauses cannot be built as written.