Shenzhen, China · Factory direct since 2007 5,000 m² plant · Every process in-house · Ships worldwide
+86 755 2796 7043 Mon–Fri 09:00–18:00 GMT+8
EN Get a Quote

Commercial

MOQ and setup: why one part costs more than ten, and where the floor is

There is no minimum order for most acrylic parts. There is a setup cost, and at low quantities the setup cost is the price.

~1,500 words · 8 min read · Updated 2026-11-10

Customers often ask what the minimum order is, expecting a number. For most fabricated acrylic parts the honest answer is one, because a single part is a normal job for a routing or laser shop. What changes at low quantity is not whether we will make it, but what proportion of the price is setup.

What setup actually is

Where the money goes on a small run
Cost elementIncurred once per orderScales with quantity
Drawing review and programmingYesNo
Material purchase (full sheet)PartlyYes, but waste falls with nesting
Machine setup and first-off checkYesNo
Finishing setup (polish, print, bond jigs)YesPartly
InspectionSetup yes, measurement yesYes
Packing and documentationYesYes

At one part, all of the once-per-order costs sit on one unit. At fifty parts they are spread, and the per-unit price falls sharply. At five hundred, the per-unit price approaches the actual production cost and stops falling.

When there genuinely is a minimum

  • Screen printing: a screen has to be burned, so a spot-colour print run has a practical floor, typically 50 pieces.
  • Custom sheet colour: a pigment batch has a minimum measured in tonnes, not pieces.
  • Custom extrusion or a bespoke profile: a die has to be made.
  • Bonded assemblies with a jig: the jig is worth making only above a certain quantity.
  • A part that uses most of a sheet: the minimum is whatever uses the sheet economically.

Everything else, including laser cutting, routing, drilling, edge polishing, heat bending and UV printing, can be done at quantity one.

How to make a small run cheaper

  1. Use a stock thickness and a stock colour. An unusual thickness or a tinted sheet may mean buying a whole sheet for one part.
  2. Accept a general tolerance. A ±0.5 mm general tolerance is free; ±0.1 mm means slower feeds and more measurement.
  3. Limit the polished edges. Polish only what is seen. Polishing is priced per metre and it dominates small thick parts.
  4. Combine parts onto one sheet. If you have several small parts, order them together and let the nesting share the material.
  5. Choose laser over routing for thin flat parts with hidden edges.
  6. Skip the inspection report unless the part is critical.

The quantity break that surprises people

For a part with a lot of hand finishing, polishing or bonding, the price per unit barely falls with quantity, because the labour is linear. A customer who expects a hundred polished blocks to cost a fifth of ten is disappointed, and the reason is that the material was never the cost.

Conversely, for a simple flat cut part, the drop from one to fifty is dramatic, because almost all of the cost at one unit was setup.

Sampling versus a small run

If the quantity needed is genuinely one or two, it is worth asking whether a sample is the right instrument. A sample is a first article whose purpose is approval; a small production run is the same work. For a customer testing a market, a run of ten costs very little more than a sample of one and gives a real stock.

Our sampling lead time is 3 to 7 business days and production is 7 to 15 business days. At very low quantities the two are often the same job, and we will say so rather than quoting a sample and then a production order for the same five parts.

What we will not do

We will not quote a headline unit price based on a volume the customer has not committed to, because that price is not real and it makes the programme unplannable. A rollout quote states the price at the programme quantity and at a single-store quantity, and both are true.

Questions this article answers

For most fabrication, no. One part is a normal job. There are genuine minimums for screen printing, custom sheet colour, custom profiles and jig-based bonded assemblies, and we will say which applies to your part.

Because the setup, programming, material purchase and first-off check are incurred once and sit entirely on that one part. At ten parts they are spread over ten.

Yes. We quote the quantity breaks and they are valid for the stated period. What we will not do is quote a hundred price and supply ten at it.

Yes. The drawing, program and finishing specification are kept, so a repeat order does not re-incur programming. That is why a repeat is usually cheaper than the first order.

Down to about 1 mm features with the laser, though handling below 5 mm becomes the constraint. Small parts are cut on a sacrificial backing and packed on tape or in a tray so they are not lost.

Reading the setup line on a quotation

Setup is the most abused line on an acrylic quotation, in both directions. Some suppliers bury labour in it; others hide it inside the unit price and then cannot explain why the price does not fall when the quantity doubles. A setup line is honest when you can check it against three things: what is being set up, how long it takes, and what the hourly rate is.

What a legitimate setup charge covers
ItemTypical timeCharged once because
Drawing and DFM review0.5–2 h The review is done once, but it informs every unit
CAM programming and nesting0.5–3 h Toolpaths and sheet layout are fixed for the run
Jig or fixture build2–8 h Bonding and drilling jigs are physical parts that get stored
First-article inspection0.5–1.5 h Measured once against the drawing, then used as the reference
Print file preparation and colour proof1–4 h Artwork rip, test print and swatch approval

Multiply those hours by the shop rate and you have a defensible setup figure. If a quotation shows setup at ten times that, the money is somewhere else — usually amortised tooling that the supplier would rather not itemise. If it shows zero setup on a bonded assembly with a jig, the jig cost is inside the unit price, and the unit price will not fall the way you expect at higher volumes.

The practical test is the second order. Ask what the setup is on a repeat: a genuine setup charge disappears or drops sharply once the jig exists, CAM is saved and the first article has been approved. A "setup" that is charged again in full on order two is a margin line wearing a cost label. We quote repeat orders with the jig and programming removed, and say so on the quote.

Ask for the quantity breaks before you commit

Send the drawing and we will quote one, ten and a hundred, so the small-run decision is made on real numbers.

WhatsApp